Case study overview

Date

Autumn 2016

Location

Gort, County Galway

Industry Sector

Education

Product Used

Tricel Novo wastewater treatment plant with a Sandcel sand polishing filter.

Project Introduction

In the following case study, we will be highlighting the solutions provided by Tricel to meet the needs of Lurga National School’s septic tank upgrade.

Request a quote for your project today!

Lurga national school

THE CHALLENGE

Following the decision to proceed with a classroom extension, Lurga National School was in need of a septic tank upgrade. After reviewing the requirements of the school and following the Environmental Protection Agency (EPA) guidelines, civil engineer Brendan Slevin specified a Tricel Novo wastewater treatment plant followed by a Tricel Sandcel sand polishing filter.

Working alongside FVG Construction, Tricel supplied, delivered and installed the septic tank upgrade.

About Lurga National School

Lurga National School was opened in 1884, the same year that the GAA was founded. Located in Gort, County Galway, it is one of the most southerly schools in this county. Lurga National School currently hosts more than 70 pupils along with seven teachers and staff.

The challenges of the project

Part of the project had to include a septic tank upgrade in order to accommodate both the extra classroom and the resulting additional pupils. This work had to be scheduled at the same time as the classroom extension was taking place.

The Installation

First steps to upgrade the septic tank

To begin with, civil engineer Brendan Slevin, from Brendan Slevin & Associates Chartered Engineers, started working on the planning application for the extension. Before making his wastewater site recommendations he took into consideration the following:

  • Site percolation test results.
  • Population Equivalent (PE) based on the maximum number of expected teachers and pupils in line with the EPA code of practice for “treatment systems for small communities, business, leisure centres and hotels”.
  • Site specifications

Additionally, the site was also compact with no adjacent suitable percolation area. As a consequence, the restricted percolation area had to be located 170m away from the school and wastewater treatment plant.

Once the planning application was successful, a tender was issued and applications were submitted by builders and contractors. It was FVG Construction & Maintenance Company Ltd who became the nominated contractor. With more than 20 years’ experience in building construction, the Galway based company contacted Tricel to discuss requirements, logistics and prices. They were very satisfied with the quality of Tricel cost-effective products and the services offered. 

Septic tank and Sand polishing filter installed

As well as building the extension, FVG successfully installed the Tricel Novo IRL 30 and decommissioned the existing septic tank.
In addition to commissioning the Tricel Novo IRL 30, Tricel installed the Sandcel sand polishing filter and provided Brendan Slevin & Associates Chartered Engineers with the installation certificate and a copy of the certified sand used as per the EPA code of practice.

 
Lurga National School Sandcel install
Lurga National School sand polishing filter install
Lurga National School Tricel Sandcel install
Lurga National School wastewater treatment install

TRICEL SOLUTION

A suitable solution was found by combining the benefits of the Tricel Novo IRL 30 wastewater treatment plant (pumped) and a Sandcel sand polishing filter to suit both the percolation test results and site restrictions whilst meeting the EPA regulations.

The wastewater would flow from the school directly into the wastewater treatment plant. A pump included with the Tricel Novo wastewater treatment plant would push the outlet effluent to the Tricel Sandcel sand polishing filter situated 170m away. The Sandcel 4800 tertiary treatment was chosen to cover the required area of 80 m2.

 

The Feedback

The septic tank upgrade at Lurga National School has been in place and working successfully since autumn 2016.  

If you have a similar project for small communities, business, schools, leisure centre and hotels and are looking for solutions to a septic tank upgrade. Contact us now to discuss your requirements and find suitable solutions. 

IF YOU NEED MORE INFORMATION

Call us now to talk about your project and we will answer your questions or concerns.

ASK FOR A QUOTE

Request a free quote today to have a quote that meets your project!

Other case studies you might like

Wastewater treatment project

The wastewater treatment project was to upgrade an existing and obsolete system. (2022)


2 min 30

Septic tank wet ground upgrade

Tricel provides Tricel Novo wastewater treatment plant with a Sandcel sand polishing filter to upgrade an old existing septic tank in a wet area. (2022)
2 min

Septic tank upgrade into a Novo

Tricel provides Tricel Novo wastewater treatment plant with a Sandcel sand polishing filter to upgrade the existing septic tank.

2 min 30

Commercial Wastewater Treatment Systems

Upgrade to an existing wastewater treatment system in a cheese processing factory (2022)
3 min

Sewage treatment plant for hotels

The client needed wastewater treatment for hotels to increase effluent performance. (2022)

3 min

Commercial wastewater denmark

A commercial wastewater system is installed at a camping site with a capacity for 130 caravans. (2015)
3 min 30

Septic tank upgrade

Tricel provides Novo wastewater treatment plant with a Sandcel sand polishing filter as a solution for a septic tank upgrade. (2016)
2 min 30

sand filter in wastewater treatment

Extension and refurbishment to an existing dwelling with Sandcel Sand polishing filter and Sewage Treatment plant (Novo UK6).

2 min 30

See all case studies


Source through all of our successful projects


2 min 30

Get in touch

 

Error: Contact form not found.