SEWAGE TREATMENT PLANTS

Septic Tank Upgrade On Wet Ground

Case study overview

Date

June 2022

Location

Ballyduff, Co. Kerry

Industry Sector

Residential

Product Used

Tricel Novo 6PE wastewater treatment plant with a Sandcel sand polishing filter 

Project Introduction

In the following case study, we’ll be detailing how our Tricel products provided the ideal solution for this septic tank upgrade on wet ground

Request a quote for your project today!

THE CHALLENGE

This case study looks at a site where the customer was looking for a solution to upgrade their old septic tank for their house. The customer had to comply with the EPA Code of Practice and install an environmentally friendly solution. The wastewater treatment system to be installed had to suit the specificities of the ground.

The Installation

The customer was required to replace their old existing septic tank. For this septic tank upgrade on wet ground they were recommended to have a pumped Tricel Novo 6 PE.

However, the customer location and the specificities of the area required an additional treatment system. The customer’s house was on a wet site, and the ground was mainly comprised of a high water level. Additionally, a stream was located at the back of the customer’s garden. 

Septic Tank upgrade
Sandcel on wet site

TRICEL SOLUTION

As there was a compulsory requirement to have an exceptional level of treatment, for this septic tank upgrade on wet ground, the customer chose our Tricel Novo Wastewater treatment plant and a Sandcel sand polishing filter.

The Tricel Novo wastewater treatment purifying level is very high, and so this product was perfect to meet the specificities of this project. The combination of a secondary wastewater treatment, Tricel Novo, and a tertiary wastewater treatment, Tricel Sandcel, meant the strict requirements from the EPA were met.

As there was a nearby stream, the water quality must be of a high level due it’s direct impact with the surrounding environment (taking special care of the nearby fauna and flora).

Tricel’s high-quality products made this septic tank upgrade on wet ground possible. The wastewater treatment system of the customer is now upgraded, updated and respectful of the environment.


Tricel is happy to develop compliant wastewater treatment solutions and contribute to the preservation of the environment.

Installation of a Tricel Sandcel

The Feedback

During the first visit a few weeks later, the technician checked if the plant was working correctly and answered the owner’s questions about the system. 

IF YOU NEED MORE INFORMATION

Call us now to talk about your project and we will answer your questions or concerns.

ASK FOR A QUOTE

Request a free quote today to have a quote that meets your project!

Other case studies you might like

Wastewater treatment project

The wastewater treatment project was to upgrade an existing and obsolete system. (2022)


2 min 30

Septic tank wet ground upgrade

Tricel provides Tricel Novo wastewater treatment plant with a Sandcel sand polishing filter to upgrade an old existing septic tank in a wet area. (2022)
2 min

Septic tank upgrade into a Novo

Tricel provides Tricel Novo wastewater treatment plant with a Sandcel sand polishing filter to upgrade the existing septic tank.

2 min 30

Commercial Wastewater Treatment Systems

Upgrade to an existing wastewater treatment system in a cheese processing factory (2022)
3 min

Sewage treatment plant for hotels

The client needed wastewater treatment for hotels to increase effluent performance. (2022)

3 min

Commercial wastewater denmark

A commercial wastewater system is installed at a camping site with a capacity for 130 caravans. (2015)
3 min 30

Septic tank upgrade

Tricel provides Novo wastewater treatment plant with a Sandcel sand polishing filter as a solution for a septic tank upgrade. (2016)
2 min 30

sand filter in wastewater treatment

Extension and refurbishment to an existing dwelling with Sandcel Sand polishing filter and Sewage Treatment plant (Novo UK6).

2 min 30

See all case studies


Source through all of our successful projects


2 min 30

Get in touch

 

Error: Contact form not found.