Summary

Upgrade to an existing wastewater treatment system

The wastewater treatment project was to upgrade an existing and obsolete system. The engineer recommended installing a Tricel Novo with a tertiary system (Tricel Puraflo).

Tricel’s agent in Kildare was then contacted by the Quantity Surveyor working on the project to quote and then deliver the wastewater treatment system. 

No further information or advice was required as the customer knew what he was looking for and didn’t require anything else. 

Once supplied, the solution was then installed. The image is of the Tricel Novo IE 30 during installation in Kildare. 

wastewater treatment project in Kildare
If you require a similar setup or are looking to upgrade your sewage treatment, don’t hesitate to contact us to discuss your wastewater treatment project.

More about the products supplied

Tricel Novo wastewater treatment plant

  • Strong & durable SMC tank
  • Low running costs (simple, energy-efficient compressor)
  • Easy installation
  • Shallow dig tank
  • Low maintenance
  • CE certified to EN12566-3

Tricel Novo Wastewater Treatment Plant

Tricel Puraflo tertiary treatment system

  • Ideal for sensitive sites
  • Provides very high-level pathogen and nutrient reduction
  • Flexible sizing options due to modular design features
  • Very low running costs
  • Easy to install
  • Very low maintenance
Tricel Puraflo

Other projects

Get in touch


    Type of request*

    Are you a*

    Your enquiry is for*


    HQ

    Tricel (Killarney) Unlimited Company
    Ballyspillane Industrial Estate, Killarney, Co. Kerry, V93 PN84, Ireland
    Tel: 00353 (0)64 6632421